Chapter 2 Preparations
4. Push up the arm stopper and tighten the screen loosened in Step 2.
Now the server is installed in the rack.
The following shows how to connect cables to cable arm. Confirm that no tension is applied to cable. See the
figures below.
Image of cable routing
(1) When the server is pulled out from rack
230
Express5800/A1040b, A2040b, A2020b, A2010b User's Guide
2. Installation and Connection
Confirm that no tension is applied to
cable when the server is pulled out
from rack.