Test Operation
1. Test Operation
1.1
Installation Process
Below Figure shows the installation process. Install in the order of the steps shown.
129
Selection of Location
Inspecting and Handling the Unit
Placing the Unit
Field Wiring
Air Tight Test and Vacuum Drying
Pipe Insulation
Checking of Device and Installation Conditions
Additional Refrigerant Charge and Check Operation
Test Run
Refrigerant Piping
Operations which require the
power to be turned on.
SiBE31-801_C
Test Operation