Daikin RTSYQ10PY1 Installation Manual

Daikin RTSYQ10PY1 Installation Manual

Vrv iii-c system air conditioner

Advertisement

[System]
RTSYQ10PY1
RTSYQ14PY1
RTSYQ16PY1
RTSYQ20PY1
[Independent units]
RTSQ8PY1
RTSQ10PY1
RTSQ12PY1
RTSQ14PY1
RTSQ16PY1
BTSQ20PY1

INSTALLATION MANUAL

System air conditioner
Conditionneur d'air VRV
Installation manual
III-C
VRV
System air conditioner
Installationsanleitung
III-C
VRV
System Klimaanlage
Manuel d'installation
III-C
Рóêоводство по монтажó
Кондиционер системы VRV
Bruksanvisning
III-C
VRV
System Klimaanlegg
Bruksanvisning
III-C
VRV
System luftkonditionerare
English
Deutsch
Français
System
óññêèé
III-C
Norsk
Svenska
Polski

Advertisement

Table of Contents
loading

Summary of Contents for Daikin RTSYQ10PY1

  • Page 1: Installation Manual

    System Klimaanlage Manuel d’installation Français Conditionneur d’air VRV III-C System Рóêоводство по монтажó óññêèé Кондиционер системы VRV III-C Bruksanvisning [System] Norsk III-C System Klimaanlegg RTSYQ10PY1 RTSYQ14PY1 RTSYQ16PY1 Bruksanvisning Svenska RTSYQ20PY1 III-C System luftkonditionerare [Independent units] RTSQ8PY1 Polski RTSQ10PY1 RTSQ12PY1 RTSQ14PY1 RTSQ16PY1...
  • Page 2 3P216950-1D...
  • Page 3 (unit: mm) RTSQ8~12 RTSQ14 ·16 BTSQ20 ≥10 ≥10 ≥10 ≥10 ≥20 50~100 50~100 ≥10 figure 1 ≥50 ≥50 ≥10 ≥100 50~100 50~100 ≥200 ≥200 ≥200 ≥400 ≥200 (unit: mm) figure 3 figure 2 figure 4 figure 5 figure 6 figure 7 figure 8 figure 9 figure 10...
  • Page 4: Table Of Contents

    figure 11 figure 12 figure 13 figure 14 figure 15 17-1 17-2 17-3 figure 16 figure 17 figure 18 figure 19 figure 20 TO IN/D UNIT TO OUT/D UNIT TO MULTI UNIT TO MULTI UNIT TO IN/D UNIT TO OUT/D UNIT TO MULTI UNIT TO MULTI UNIT TO MULTI UNIT F1 F2...
  • Page 5 (A1P) (A1P) F1 F2 F1 F2 F1 F2 F1 F2 F1 F2 figure 23 figure 24 figure 25 figure 26 figure 27 figure 28 : 21 : 23 : 22 : 24 figure 29 figure 30 figure 31 : 17 : 19 : 18 : 20...
  • Page 6: First Of All

    FIRST OF ALL shocks or fire. • This document is an installation manual for the Daikin RTSYQ-P • Be sure to switch off the unit before touching any electrical parts. • Make sure that all wiring is secured, the specified wires are used, Series VRV Inverter.
  • Page 7: Special Notice Of Product

    Limit by the total maximum refrigerant charge Caution The total maximum refrigerant charge of a VRV system must be • While following the instructions in this installation manual, below 100kg, this to be in accordance with CE requirement install drain piping to ensure proper drainage and insulate pip- (EN60335-2-40 standard).
  • Page 8: Technical And Electrical Specifications

    • The indoor units that combined with RTSYQ-P system for air con- ditioning are Daikin VRV series indoor units that compatible with Gas side accessory pipe Name R410A. To learn which indoor units are compatible with R410A, refer to the product catalogs. To combine with other refrigerant 8 type 1 pc.
  • Page 9: Selection Of Location

    • If the work conditions in figure 2 do not apply, contact your dealer should be reported immediately to the carrier claims agent. or Daikin directly. • When handling the unit, take into account the following: (Refer to figure 2) Fragile, handle the unit with care.
  • Page 10: Placing The Unit

    (Refer to figure 5) Thickness :Select a thickness for the refrigerant piping which 1. Fork insertion place (outdoor unit only) complies with national and local laws. 2. Fork For R410A, the design pressure is 4.0 MPa (40- 3. Opening (large) bar).
  • Page 11: Connecting The Refrigerant Piping

    6-4 Connecting the refrigerant piping (Refer to figure 12) 1. Removal procedure for pinch piping of function unit Direction to bring out the pipes 2. Pinch pipes (×4) The pipes (liquid, gas, and equalizer pipes) between outdoor units 3. Step 1: Cut the port piping connected to the pinch piping in the case of the outdoor unit multi system, the pipes (liquid and with an appropriate tool, such as a pipe cutter.
  • Page 12: Figure

    9. Piping on liquid side (procured locally) (2) Install the piping between the outdoor units horizontally or 10. Piping on gas side (procured locally) with a rising gradient toward outdoor unit A from outdoor unit 11. Blazing B in order to prevent oil remaining in the piping. 12.
  • Page 13: Figure

    Branching the refrigerant piping Prohibited pattern Heed the restrictions below when installing the refrigerant branch- ing kit and read the installation instruction manual with the kit. Front connection Outdoor unit Function unit (Improper installation could lead to malfunctioning or breakdown of the outdoor unit.) Unit Unit...
  • Page 14: Example Of Connection

    6-5 Example of connection English...
  • Page 15 English...
  • Page 16 English...
  • Page 17: Field Wiring

    φ 3, 50Hz BTSQ20PY1 380-415V 15.2A Telephone ground wires and lightning rods : dangerous when <for system> struck by lightning due to abnormal rise in electrical potential in φ 3, 50Hz RTSYQ10PY1 380-415V 21.6A the grounding. φ 3, 50Hz RTSYQ14PY1 380-415V 31.5A •...
  • Page 18: Leading Wire Procedure

    7-3 Leading wire Procedure • All transmission wiring should use sheathed vinyl cord 0.75-1.25 mm or cable (duplex). • The power wiring and ground wiring are passed out from the • Transmission wiring should be done within the following limita- power wiring hole on the sides, the front (knock hole) or the bot- tions.
  • Page 19: Procedure For Wiring Inside Units

    13. Separate at least 50 mm. Note 14. In the case of pulling in the transmission wiring from the • For wiring, use the designated power wire and connect firmly, front side. then secure to prevent outside pressure being exerted on the ter- 15.
  • Page 20: Pipe Insulation

    <The system for air tight test and vacuum drying> (2) If the pressure does not reach –100.7 kPa even after depressur- • Referring to figure 29, connect an nitrogen tank, refrigerant tank, izing for at least two hours, repeat the vacuum breakdown - vac- and a vacuum pump to the outdoor unit and function unit.
  • Page 21: Additional Refrigerant Charge And Check Operation

    For those doing pipe work • See [Shutoff valve operation procedure] in chapter 9-1 for details on how to handle shutoff valves. Make sure piping size is correct. • After adding the refrigerant, make sure to close the lid of the See “6-1 Selection of piping material and Refrigerant branch- refrigerant charging port.
  • Page 22: Figure

    Tightening torque The sizes of the shutoff valves on each model and the tightening torque for each size are listed in the table below. <Size of Shutoff Valve> 8HP type 10HP type 12HP type 14HP type 16HP type φ9.5 The 12HP type corre- Liquid pipe φ12.7 sponds to the 12.7-diame-...
  • Page 23: Procedure Of Additional Refrigerant Charging

    [How to Check How Many Units are Connected] It is possible to find out how many indoor or outdoor (function) unit in the system are turned on by operating the push button on the PC-board (A1P) of outdoor unit (In case of multi system master unit). Follow the procedure below to check how many indoor or outdoor units are turned on.
  • Page 24: Figure

    During charging in heating mode, a person must manually close In case of cooling mode valve A and stop operation. (7) Push the TEST button (BS4) once within 5 minutes after proce- Beforehand, check the remaining refrigerant that is needed to dure (6) (*4) and close the all front panels (*5).
  • Page 25: Procedure Of Check Operation

    [Remote controller cooling mode malfunction code] (2) Make the onsite settings as needed using the push button (BS1- BS5) on the outdoor unit PC-board (A1P) with the power on. (See Code The work contents “10. ONSITE SETTINGS”) Charging is almost finished. Ready to close the valve A. (3) Perform the check operation following the Check Operation The refrigerant tank is empty.
  • Page 26: Test Run

    11. TEST RUN Maximum concentration level The maximum charge of refrigerant and the calculation of the maxi- mum concentration of refrigerant is directly related to the humanly 11-1 Before test run occupied space in to which it could leak. • Make sure the following works are completed in accordance with The unit of measurement of the concentration is kg/m ( the weight in the installation manual.
  • Page 27 Dealing with the situations where the result exceeds the maxi- mum concentration level. Where the installation of a facility results in a concentration in excess of the maximum concentration level then it will be neces- sary to revise the system. Please consult your Daikin supplier. English...
  • Page 28 3P201178-10P EM07A033B (0908) HT...

Table of Contents