System Klimaanlage Manuel d’installation Français Conditionneur d’air VRV III-C System Рóêоводство по монтажó óññêèé Кондиционер системы VRV III-C Bruksanvisning [System] Norsk III-C System Klimaanlegg RTSYQ10PY1 RTSYQ14PY1 RTSYQ16PY1 Bruksanvisning Svenska RTSYQ20PY1 III-C System luftkonditionerare [Independent units] RTSQ8PY1 Polski RTSQ10PY1 RTSQ12PY1 RTSQ14PY1 RTSQ16PY1...
figure 11 figure 12 figure 13 figure 14 figure 15 17-1 17-2 17-3 figure 16 figure 17 figure 18 figure 19 figure 20 TO IN/D UNIT TO OUT/D UNIT TO MULTI UNIT TO MULTI UNIT TO IN/D UNIT TO OUT/D UNIT TO MULTI UNIT TO MULTI UNIT TO MULTI UNIT F1 F2...
Page 5
(A1P) (A1P) F1 F2 F1 F2 F1 F2 F1 F2 F1 F2 figure 23 figure 24 figure 25 figure 26 figure 27 figure 28 : 21 : 23 : 22 : 24 figure 29 figure 30 figure 31 : 17 : 19 : 18 : 20...
FIRST OF ALL shocks or fire. • This document is an installation manual for the Daikin RTSYQ-P • Be sure to switch off the unit before touching any electrical parts. • Make sure that all wiring is secured, the specified wires are used, Series VRV Inverter.
Limit by the total maximum refrigerant charge Caution The total maximum refrigerant charge of a VRV system must be • While following the instructions in this installation manual, below 100kg, this to be in accordance with CE requirement install drain piping to ensure proper drainage and insulate pip- (EN60335-2-40 standard).
• The indoor units that combined with RTSYQ-P system for air con- ditioning are Daikin VRV series indoor units that compatible with Gas side accessory pipe Name R410A. To learn which indoor units are compatible with R410A, refer to the product catalogs. To combine with other refrigerant 8 type 1 pc.
• If the work conditions in figure 2 do not apply, contact your dealer should be reported immediately to the carrier claims agent. or Daikin directly. • When handling the unit, take into account the following: (Refer to figure 2) Fragile, handle the unit with care.
(Refer to figure 5) Thickness :Select a thickness for the refrigerant piping which 1. Fork insertion place (outdoor unit only) complies with national and local laws. 2. Fork For R410A, the design pressure is 4.0 MPa (40- 3. Opening (large) bar).
6-4 Connecting the refrigerant piping (Refer to figure 12) 1. Removal procedure for pinch piping of function unit Direction to bring out the pipes 2. Pinch pipes (×4) The pipes (liquid, gas, and equalizer pipes) between outdoor units 3. Step 1: Cut the port piping connected to the pinch piping in the case of the outdoor unit multi system, the pipes (liquid and with an appropriate tool, such as a pipe cutter.
9. Piping on liquid side (procured locally) (2) Install the piping between the outdoor units horizontally or 10. Piping on gas side (procured locally) with a rising gradient toward outdoor unit A from outdoor unit 11. Blazing B in order to prevent oil remaining in the piping. 12.
Branching the refrigerant piping Prohibited pattern Heed the restrictions below when installing the refrigerant branch- ing kit and read the installation instruction manual with the kit. Front connection Outdoor unit Function unit (Improper installation could lead to malfunctioning or breakdown of the outdoor unit.) Unit Unit...
7-3 Leading wire Procedure • All transmission wiring should use sheathed vinyl cord 0.75-1.25 mm or cable (duplex). • The power wiring and ground wiring are passed out from the • Transmission wiring should be done within the following limita- power wiring hole on the sides, the front (knock hole) or the bot- tions.
13. Separate at least 50 mm. Note 14. In the case of pulling in the transmission wiring from the • For wiring, use the designated power wire and connect firmly, front side. then secure to prevent outside pressure being exerted on the ter- 15.
<The system for air tight test and vacuum drying> (2) If the pressure does not reach –100.7 kPa even after depressur- • Referring to figure 29, connect an nitrogen tank, refrigerant tank, izing for at least two hours, repeat the vacuum breakdown - vac- and a vacuum pump to the outdoor unit and function unit.
For those doing pipe work • See [Shutoff valve operation procedure] in chapter 9-1 for details on how to handle shutoff valves. Make sure piping size is correct. • After adding the refrigerant, make sure to close the lid of the See “6-1 Selection of piping material and Refrigerant branch- refrigerant charging port.
Tightening torque The sizes of the shutoff valves on each model and the tightening torque for each size are listed in the table below. <Size of Shutoff Valve> 8HP type 10HP type 12HP type 14HP type 16HP type φ9.5 The 12HP type corre- Liquid pipe φ12.7 sponds to the 12.7-diame-...
[How to Check How Many Units are Connected] It is possible to find out how many indoor or outdoor (function) unit in the system are turned on by operating the push button on the PC-board (A1P) of outdoor unit (In case of multi system master unit). Follow the procedure below to check how many indoor or outdoor units are turned on.
During charging in heating mode, a person must manually close In case of cooling mode valve A and stop operation. (7) Push the TEST button (BS4) once within 5 minutes after proce- Beforehand, check the remaining refrigerant that is needed to dure (6) (*4) and close the all front panels (*5).
[Remote controller cooling mode malfunction code] (2) Make the onsite settings as needed using the push button (BS1- BS5) on the outdoor unit PC-board (A1P) with the power on. (See Code The work contents “10. ONSITE SETTINGS”) Charging is almost finished. Ready to close the valve A. (3) Perform the check operation following the Check Operation The refrigerant tank is empty.
11. TEST RUN Maximum concentration level The maximum charge of refrigerant and the calculation of the maxi- mum concentration of refrigerant is directly related to the humanly 11-1 Before test run occupied space in to which it could leak. • Make sure the following works are completed in accordance with The unit of measurement of the concentration is kg/m ( the weight in the installation manual.
Page 27
Dealing with the situations where the result exceeds the maxi- mum concentration level. Where the installation of a facility results in a concentration in excess of the maximum concentration level then it will be neces- sary to revise the system. Please consult your Daikin supplier. English...