:LULQJ
7RROV DQG PDWHULDO UHTXLUHG
To wire the S7-300, you require the tools and materials listed in the table below.
Table 7-2
:LULQJ WRROV DQG PDWHULDOV <RX UHTXLUH 
connecting the protective conductor to the
rail
Adjusting the power supply module to mains
voltage
Wiring the power supply module and the
CPU
Wiring the front connector
%ULHI RYHUYLHZ RI WKH SRZHU VXSSO\ PRGXOH DQG &38
Table 7-3
solid conductors
flexible conductors
Without wire end ferrule
With wire end ferrule
Number of conductors per terminal
Diameter of the conductor insulation
Stripped length
Wire end ferrules to DIN 46228
Without insulating collar
With insulating collar
7-2
Tools and materials for wiring

Conditions for connecting the PS and CPU

&RQQHFWDEOH FDEOHV
S7-300 Automation System, Hardware and Installation: CPU 312IFM - 318-2 DP
IRU 
Wrench (size 10)
Protective conductor cable (cross-
section ≥ 10 mm
2
) with M6 cable lug
M6 nut, washer, spring lock washer
Screwdriver with a blade width of 4.5 mm
Screwdriver with a blade width of 3.5 mm,
side-cutter, wire stripping tool
Flexible cable, e.g. sheathed flexible cable
2
3 x 1.5 mm
If required, wire end ferrules to DIN 46228
Screwdriver with a blade width of 3.5 mm,
side-cutter, wire stripping tool
2
Flexible cable 0.25 mm
If required, shielded cables
If required, wire end ferrules to DIN 46228
WR 36 DQG &38
No
2
2
0.25 mm
to 2.5 mm
2
2
0.25 mm
to 1.5 mm
1 conductor, or 2 conductors up to 1.5 mm
(total) in a common wire end ferrule
max. 3.8 mm
11 mm
Version A, 10 mm to 12 mm length
Version E, up to 12 mm length
2
to 0.75/1.5 mm
2
A5E00203919-01