Standard 3.00
M3900 Flash Download
Move (MOV) or remove (OUT through LD 11 or Automatic Set
Relocation) to an M3900 telephone before its flash download starts
prevents download to the telephone in this cycle of system-wide flash
download.
A new M3900 telephone added (through LD 11 or Automatic Set
Relocation) after the FDLS command is issued is not included in this
round of system-side download.
When scheduling the Flash Download of telephones, note that one hour
before the Midnight routines execute, the flash download process is
gracefully stopped. The Flash downloading resumes once midnight routines
are executed.
When a schedule is defined in LD 97 and the Flash Download is started (by
entering the FDLS command in LD 32), all scheduled telephones are queued
for download. The download process remains active in the background until
the download is complete or is canceled (using the FDLC command in LD
32). If the download is active in the background (telephones not actively
downloading per the scheduled download time) and the download schedule is
removed in LD 97, the download begins immediately for the telephones that
remain in the download queue. Use the LD x SUSP command to load an
overlay when the download is active in the background (scheduled but not
actively downloading telephones). It is also not possible to perform a single
telephone download (FDLU, FDLI, or FDLF command from LD 32) while
the download is active in the background. If an individual download is
attempted in this case, the system indicates that the PSDL is not idle. If an
individual telephone download is necessary while the download is active in
the background, you must cancel the download in LD 32 using the FDLC
command. Once the individual downloads are complete, you can restart the
schedule download with the FLDS command in LD 32.
Note: If the force option is used with the FDLS command, all telephones
in the original schedule are downloaded.
For M3900 telephones actively being flash downloaded when the Flash
Download Cancel FDLC command is issued, the flash download to these
telephones is completed before the flash download process cancels.