Furuno FCV-1900/B/G Installation Manual page 20

Table of Contents

Advertisement

2. WIRING
2. Unfasten the binding screws from the case inside the interface unit.
3. Unfasten the left-hand super-gland seal nut, then remove the gasket assembly
from the seal nut.
4. Pass the UL2464-SB/1062 cable assembly end through the seal nut, fixture and
gasket in order, then pass the cable through the super-gland and into the proces-
sor unit.
5. Connect the harness plugs to the sockets J1 and J2.
6. Adjust the cable length inside the interface unit, place the gasket assembly in the
seal nut and then fasten them both securely.
7. Unfasten the seal nut at the left bottom of the pro-
cessor unit, then pull out the gasket assembly
from the nut.
8. Pass the loose end of the cable assembly through
the seal nut, fixture and gasket then pass it into
the processor unit through the super-gland.
To Processor unit
To Telesounder
J1 PWR
J5 TS-80M2
(HIGH
J4 TS-80M2
(LOW
J1 PWR
J4 TS-80M2 (LOW)
J2 CTRL
J3 TS-7110
J8 TS-7120
GND terminal
J2 CTRL
J8 TS-7120
J3 TS-7110
J5 TS-80M2 (HIGH)
13
CN-13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents