Chapter 4 Equipment List
This table shows the name and functions of installation hardware.
Equipment Name
HANGER ASSEM (B)
MOUNTING BRACKET
19" RACK BRACKET (A)
19" RACK BRACKET (B)
I/F BRACKET ASSEM
BASE TRAY ASSEM
Page 4- 2
Wall Hanger Assembly
One HANGER ASSEM is required per PIM for Wall Mounting
Installation.
Safety Mounting Bracket
Used as an overhead hanger for Floor Standing Installation. Wire,
chain or eyebolts are to be locally provided, to secure the bracket.
To be installed on the top PIM in four or more modules of stack. It
provides 1.1G shockproof construction.
19-inch Rack Mounting Bracket Type A
One bracket is required for one PIM configuration.
One bracket is required for the top PIM of multiple module
configurations.
19-inch Rack Mounting Bracket Type B
One bracket is required for the bottom module of multiple module
.
configurations
Inter Frame Bracket Assembly
Used to join the frames in two-stack configuration, for Floor
Standing Installation.
Base Tray Assembly
One BASE TRAY is required per one frame for Floor Standing
Installation of Stationary Equipment.