Installing The Sfp Transceiver - Planet LRP-822CS User Manual

8-port coax + 2-port 10/100/1000t + 2-port 100/1000x sfp long reach poe over coaxial managed switch
Hide thumbs Also See for LRP-822CS:
Table of Contents

Advertisement

Step 3:
Secure the brackets tightly.
Step 4:
Follow the same steps to attach the second bracket to the opposite side.
Step 5:
After the brackets are attached to the LRP Managed Switch, use suitable screws to securely attach the brackets to the
rack,
as shown in
Figure
Step 6:
Proceeds with Steps 4 and 5 of session 2.2.1 Desktop Installation to connect the network cabling and supply power to
the LRP Managed Switch.

2.2.3 Installing the SFP transceiver

The sections describe how to insert an SFP transceiver into an SFP slot. The SFP transceivers are hot-pluggable and
hot-swappable. You can plug in and out the transceiver to/from any SFP port without having to power down the LRP Managed
Switch, as the
Figure 2-1-7
Figure 2-1-5 Attach Brackets to the LRP Managed Switch.
You must use the screws supplied with the mounting brackets. Damage caused to the parts by
using incorrect screws would invalidate the warranty.
2-1-6.
Figure 2-1-6 Mounting LRP Managed Switch in a Rack
shows.
27
User's Manual of LRP-822CS

Advertisement

Table of Contents
loading

Table of Contents