3

Regulations and operating conditions

3
Regulations and operating conditions
3.1

Extracts from regulations

The Logamax plus GB162 gas condensing boilers
comply with the standard regulations of the Gas
Appliances Directive 90/396/EEC. The requirements of
standards EN 483 and EN 677 were taken into
consideration.
When installing and operating the system, observe the
following:
• Technical building rules
• Legal requirements and
• Local regulations
Installation, gas and flue gas connections,
commissioning, power supply as well as maintenance and
repair work must only be carried out by authorised
contractors.
Permits
The installation of a gas condensing boiler may need to be
notified to and approved by the relevant gas supply utility.
Gas condensing boilers may only be operated with a flue
system that has been designed for the specific appliance
3.2

Operating requirements

The operating conditions in table 12 are part of the
warranty conditions for the Logamax plus GB162 gas
condensing boilers.
Logamax
plus
Max. flow
temperature
May reach
GB162
85 °C at full
output
Table 12 Operating conditions Logamax plus GB162
1) Heating circuit control with mixer improves the control characteristics; particularly recommended for systems with several heating circuits
30
Minimumboiler
Minimumboiler
water flow rate
water
temperature
type and that has been approved according to relevant
building regulations. If the gas condensing boiler is to be
installed in a room designated for constant occupation, a
flue system that has been approved for such locations
must be allowed for.
Prior to the installation, the relevant flue gas inspector and
the waste water authority may need to be notified.
Regional approvals with regard to the flue system and the
introduction of condensate into the public sewer system
may be required.
Maintenance
According to paragraph 10 of the Energy Savings Order
(EnEV) [Germany], the system must be correctly
operated, maintained and repaired.
We recommend system users enter into a maintenance
contract with their local heating contractor covering an
annual inspection and any required maintenance. Regular
inspection and maintenance are pre-requisites for reliable
and economical operation.
These conditions are assured with a suitable hydraulic
circuit and boiler control (hydraulic connection
and fig. 47, page 53).
Operating conditions (warranty conditions)
Operating
Heating
interruption
(total boiler
control
shutdown)
mixer
No requirements
6 720 645 821 (2010/09) – Logamax plus GB162
Minimum
circuit
return
temperature
with
1)
full load, ΔT must be
fig. 46
Other
To transfer the full
appliance output at
< 25 K

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents