Powering On The Server System - NEC EXPRESS5800/140Hb Service Manual

Hide thumbs Also See for EXPRESS5800/140Hb:
Table of Contents

Advertisement

Powering On the Server System

Power on your system as follows.
1. Make sure all external devices, such as a video display, keyboard, and
mouse have been connected, and the power cords are connected.
2. Power on the video display and any other external devices.
Note:
control unit such as an UPS (Uninterruptive Power Supply)
make sure that the power control unit is powered on.
3. Press the push-button power on/off switch on the front panel (see
Figure 2-13). Verify that the server power-on LED is lit.
Note:
board monitors and logs system voltage changes. When
powering up or down your system you may experience a
1–5 second delay from the time you press the push-button
power on/off switch on the front panel and your system
powering up or down. This is normal system operation and is
required by the server management logic.
Figure 2-13. Power On/OFF Switch and Power-On Indicator
2-20 Setting Up the System
If the server power cord is connected to a power
The server management logic on your system
A
Power on/off switch
B
Power-on LED

Advertisement

Table of Contents
loading

Table of Contents