Comtrol DeviceMaster PRO Installation And Configuration Manual page 25

Hide thumbs Also See for DeviceMaster PRO:
Table of Contents

Advertisement

DeviceMaster Installation and Configuration Guide: 2000506 Rev. B
5. Verify that the PWR LED has completed the boot cycle and network connection for
the DeviceMaster is functioning properly using the table below.
LED on the front panel of the DeviceMaster is lit, indicating you have power
and it has completed the boot cycle.
Note: The PWR LED flashes while booting and it takes approximately 15
PWR
seconds for the Bootloader to complete the cycle. When the
Bootloader completes the cycle, the LED has a solid, steady light that
blinks approximately every 10 seconds.
The red LNK ACT LED is lit, indicating that
LNK
you have a working Ethernet connection.
ACT
If the red COL LED is lit, there is a network
COL
collision.
If the red 100 LED is lit, it indicates a working
100 MB Ethernet connection (100 MB
100
network, only). If the LED is not lit, it indicates
a 10 MB Ethernet connection.
Note: For additional LED information, go to the PWR LED table on Page 97.
6. Go to
Initial Configuration on Page 33
configure the DeviceMaster for use.
4-Port and 8-Port LED Descriptions
for default network settings and how to
4-Port and 8-Port Models
10/100 NETWORK
LNK
ACT
COL
100
UP
DOWN
Hardware Installation - 25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Devicemaster rtsDevicemaster serial hub

Table of Contents