MTU 12 V 4000 M33F Operating Instructions Manual page 204

Table of Contents

Advertisement

Preparatory steps – Vertical air intake
1.
Drain engine coolant (→ Page 231).
2.
Remove air filter (→ Page 210).
3.
Seal all openings with suitable covers.
4.
Remove charge-air pipework (1) from ex-
haust turbocharger to intercooler.
5.
Remove oil lines (2).
6.
Loosen clamp (1).
7.
Remove intake housing (3) with actuating
cylinder (2).
204 | Task Description | MS150069/02E 2014-03

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents