Checking The Serverboard Setup - Supero SUPERSERVER 2026T-6RFT+ User Manual

Table of Contents

Advertisement

S
S
UPER
ERVER 2026T-6RFT+/6RF+ User's Manual
2-6

Checking the Serverboard Setup

After you install the system in the rack, you will need to open the top cover to
make sure the serverboard is properly installed and all the connections have been
made.
Accessing the Inside of the System
1. Disconnect the chassis from any power source.
2. Press both release tabs at the same time to release the cover from the locked
position.
3. Once the top cover has been released, slide the cover backwards, toward the
rear of the chassis.
4. Lift the cover up and off the chassis.
Checking the Components
1. You may have one or two processors already installed in the serverboard.
Each processor needs its own heatsink. See Chapter 5 for instructions on
processor and heatsink installation.
2. Your server system may have come with system memory already installed.
Make sure all DIMMs are fully seated in their slots. For details on adding
system memory, refer to Chapter 5.
3. If desired, you can install an add-on card to the system. See Chapter 5 for
details on installing PCI add-on cards.
4. Make sure all power and data cables are properly connected and not blocking
the chassis airfl ow. See Chapter 5 for details on cable connections.
2-10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Superserver 2026t-6rf+

Table of Contents