Verifying Installation - Huawei Quidway S5600 Series Installation Manual

Hide thumbs Also See for Quidway S5600 Series:
Table of Contents

Advertisement

Installation Manual
Quidway S5600 Series Ethernet Switches
Caution:
When installing/removing an optional interface module, note that:
Do not exert excessive strength on the module or touch the components on the
module surface.
Install a blank filler panel, if you do not want to install a new module right after the old
one is removed, to keep the dust out and ensure the normal ventilation of the switch.

3.7 Verifying Installation

The correct power source is used.
The ground wire is securely connected.
Both of the console cable and power cord are correctly connected.
All the interface cables are routed indoors. If there are cables outdoors, check that
the socket strip with lightning protection and lightning arresters for network ports
have been correctly connected.
Huawei Technologies Proprietary
3-13
Chapter 3 Installing the Switch

Advertisement

Table of Contents
loading

Table of Contents