Cornelius Granita Training Manual page 47

Ice peak
Table of Contents

Advertisement

S
C
ERVICE
ONTROL
1.
Open the control panel door, push the control
panel door to either side and pull forward to
remove.
2.
Remove the 2 screws from the upper plastic
molding and lift the left side panel out of the
lower plastic molding.
3.
Remove 2 7/32 nuts and lock washers that hold
the control board in place.
4.
Use caution when separating the display and main board not to loose the plastic stand offs. NOTE: It
is a good idea to mark all connections before disconnecting the wires.
© 2003, IMI Cornelius Inc.
B
OARD
Connector I.D.
Display Board
- 39 -
Ice Peak Training Manual
FIGURE 75
FIGURE 76
FIGURE 77
Plastic Stand Off
Main Board
Publication Number: TP01057
Screws

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents