Cornelius Granita Training Manual page 23

Ice peak
Table of Contents

Advertisement

11. Reassemble the product bowl, positioning it into place.
Make sure that the bowl fits tightly to the bowl seal. We
also suggest that the rear part of the bowl be moistened
with water or lightly lubricated at the point where it fits
together with the seal to make it easier to install the bowl.
• The lower right and left bowl flanges should fit on the
outside of each black triangle edge. The lid cover will
not fit properly if this is not correctly positioned.
12. Secure the product bowl by keeping it lifted until the bolt is
aligned with its hole, then tightly screw on the locking
knobs without exerting excessive pressure to avoid crack-
ing the bowl.
13. Reassemble the mixing rod so that its gears are aligned
with the lower gear ring. This will allow the front pin to fit
perfectly in its position on the bowl.
14. Reinstall the drain tray. Make sure that the condensation
drainage tube (see Figure 7) is reinserted into its correct
fixed position, allowing it to drain into the tray.
15. Plug the unit back into appropriate power supply.
16. After the cleaning and reassembly of the mixing parts and
bowl as per above instructions, fill the bowl with a mix of
water and an approved sanitizing solution (example Stera
Sheen), according to the measures specified.
NOTE: Add 4 ounces of Stera Sheen to 4 gallons (15 liters)
o
o
of 120
F (50
C) water to achieve a concentrate of 100
parts per million.
© 2003, IMI Cornelius Inc.
Locking Knobs
- 17 -
Ice Peak Training Manual
Product Bowl
FIGURE 28
Product Bowl
Bolt
Bolt Hole
FIGURE 29
Mixing Rod
FIGURE 30
Publication Number: TP01057

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents