Baxi Solo 3 30 PF System Installation And Servicing Instructions page 31

Wall mounted powered flue system boiler gas fired central heating unit
Table of Contents

Advertisement

6.0
Installation - Page 31
6.18 Making the Electrical Connections
1. Remove the cover from the control box by removing the 2
screws (Fig. 74).
2. Slide the box forward for easier access.
3. Route the supply cable via the control box from the rear
of the appliance.
4. The terminal strips may be removed by carefully pulling
forward. Connect the supply cable to the terminal strip (Fig.
77).
IMPORTANT - When installing in conjunction with a
thermal store or heat store please refer to the store
manufacturers installation instructions when wiring the
boiler.
5. The pump is connected to the boiler P.C.B. terminals.
6. A permanent live must be connected to the 'L' terminal.
7. The switched live must be connected to the 'S/L' terminal.
8. Clamp the cable in the grip provided. Ensure that the
length of the supply cable is such that the current carrying
wires become taut before the earth wires if the cable should
pull out of the cable clamp (Fig. 76).
9. Tuck the cable along the side of the box and clip to the
wall where necessary. Make sure sufficient slack is left to
allow the box to slide forward for future access. A cable clip
is fitted at the side of the box.
10. For optional integral clock kit follow instructions provided.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents