Changing Components - Baxi Solo 3 30 PF System Installation And Servicing Instructions

Wall mounted powered flue system boiler gas fired central heating unit
Table of Contents

Advertisement

11.0 Changing Components - Page 41
11.10
Burner (Fig. 118)
1. Remove the burner assembly by pulling it forward.
2. Fit new burner and re-assemble all components in
reverse order of dismantling.
11.11
Burner Injector (Fig. 120)
1. Release and remove the burner injector which is screwed
into the burner feed manifold.
2. Fit the new burner injector ensuring that the copper
washer is in position. Tighten the injector fully.
3. Re-assemble all components in reverse order.
11.12
Pilot Burner Injector (Fig. 121)
1. Remove the right hand side insulation carrier bracket by
releasing the screw. Remove the side insulation panel (Fig.
122).
2. Release the screw securing the pilot hood and remove.
Carefully remove the pilot injector. Fit the new pilot injector
ensuring the new sealing washer is in position. Tighten the
injector fully.
3. Re-assemble all components in reverse order.
11.13
Gas Manifold (Fig. 123)
1. Undo the ¼ turn screws and drop the facia panel down.
2. Pull the electrode lead off the electrode.
3. Remove the right hand side insulation carrier bracket by
slackening the screw. Remove the burner. Remove the side
insulation panel (Fig. 122).
4. Undo the three screws securing the brass inlet adaptor to
the manifold.
5. Remove the two screws securing the manifold from the
inside of the combustion box and slide the manifold forward
from under the two rear locating studs, taking care not to
lose the gasket.
6. Remove the electrode
7. Replace all ancillary components onto manifold and
replace manifold by sliding rear edge backwards under the
two rear locating studs and securing from inside the
combustion box using the two screws previously removed.
Ensure that the sealing gasket is properly positioned and
undamaged.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents