Chapter 2 Server Installation; Overview; Unpacking The System; Preparing For Setup - Supero SUPERSERVER 6017R-WRF User Manual

Table of Contents

Advertisement

2-1

Overview

This chapter provides a quick setup checklist to get your SuperServer
6017R-WRF/NTF up and running. Following these steps in the order given should
enable you to have the system operational within a minimum amount of time.
This quick setup assumes that your system has come to you with the processors
and memory preinstalled. If your system is not already fully integrated with a
serverboard, processors, system memory etc., please turn to the chapter or section
noted in each step for details on installing specifi c components.
2-2

Unpacking the System

You should inspect the box the SuperServer 6017R-WRF/NTF was shipped in and
note if it was damaged in any way. If the server itself shows damage you should
fi le a damage claim with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the SuperServer
6017R-WRF/NTF. It should be situated in a clean, dust-free area that is well
ventilated. Avoid areas where heat, electrical noise and electromagnetic fi elds are
generated. You will also need it placed near a grounded power outlet. Be sure to
read the Rack and Server Precautions in the next section.
2-3

Preparing for Setup

The box the SuperServer 6017R-WRF/NTF was shipped in should include two
sets of rail assemblies, two rail mounting brackets and the mounting screws you
will need to install the system into the rack. Follow the steps in the order given to
complete the installation process in a minimum amount of time. Please read this
section in its entirety before you begin the installation procedure outlined in the
sections that follow.
Chapter 2
Server Installation
2-1
Chapter 2: Server Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Superserver 6017r-ntf

Table of Contents