Installing The Power Cables-Dc Units; Grounding Stud And Power Cable Retainer Clip - Patton SmartNode 4300 User Manual

Ipchannel bank/ analog access gateways
Hide thumbs Also See for SmartNode 4300:
Table of Contents

Advertisement

SmartNode 4300 Series User Manual
2. Rotate the power cable retainer clip so it secures the power cable plug in the IEC-320 connector as shown
in figure 12.
3. Repeat steps 1 and 2 to install the remaining power cable.
4. Verify that the AC power cord included with your IpChannel Bank is compatible with local standards. If it
is not, refer to chapter 5,
compatible power cord.
5. Connect the male end of the power cord to an appropriate power outlet.
6. Verify that the green POWER LED is lit.
Hardware installation is complete. Refer to chapter 4,
page 34.
Installing the power cables—DC units
WARNING
Installing the IpChannel Bank
Grounding stud
Figure 12. Grounding stud and power cable retainer clip
"Contacting Patton for Assistance"
Mains Voltage: Do not open the case the when the power cord
is attached. Line voltages are present within the power supply
when the power cords are connected. The mains outlet that is
utilized to power the devise shall be within 10 feet (3 meters) of
the device, shall be easily accessible, and protected by a circuit
breaker.
Power cable
retainer clip
on page 42 to find out how to replace it with
"Getting Started with the SmartNode 4300 Series"
3 • Hardware installation
on
32

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents