TOHATSU 40B2 Owner's Manual page 29

Hide thumbs Also See for 40B2:
Table of Contents

Advertisement

⑥ Install the hose clamp to the cord
grommet.
Install the cord clamp.
Bolt
Cord clamp
⑦ Adjust the cable joint (shift side) so
that the hole meets with the shift
arm pin, and lock the cable joint
with the nut, and insert the shift
arm pin and then secure with a
washer and R-shaped pin. Also,
adjust the cable joint (throttle
side) so that the hole meets with
the advancer arm pin, and lock
the cable joint with the nut, and
insert the advancer arm pin and
then secure with a washer and
R-shaped pin.
Throttle cable joint
Shift cable joint
Shift arm
Hose clamp
R-shaped pin
Washer
Connecting Cords and cable [30/40/50]
① Connect cable harness B and
meter lead wire to cable harness A.
Cable
Hamess A
② Place and fix Cable harness B to
P.T. switch bracket as shown.
P.T. Switch Bracket
Band
③ Connect the trim sender and the
extension cable trim sensor.
Bottom cowl
Extension cable
trim sender
CAUTION
!
Do not disconnect the electric couplers
while the engine is running, as this will
damage the C.D. unit and could result
in a serious electric shock.
29
INSTALLATION
Cable
Hamess B
Meter lead wire
Trim sender cable
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

50b290c2115a275c2Md 30b2

Table of Contents