Kohler Command PRO CS Service Manual page 150

4-12.75 hp horizontal crankshaft
Table of Contents

Advertisement

Section 11
Reassembly
Figure 11-84. CS8.5 (Spec 92xxxx) 10, CS-12
Mounting Right Fuel Tank Support.
CS8.5 (spec. 95xxxx): Align and mount the
throttle control bracket to the top of the crankcase
with the hex flange screw. Make sure the hole in
the bracket for mounting the base pan is aligned
with the threaded hole in the crankcase. Torque
the screw to 10-13 N·m (88-106 in. lb.). On
retractable start engines, mount the Oil Sentry
control module to the crankcase and attach the
ground lead to the same mounting screw. Torque
the screw to 10-12 N·m (88-106 in. lb.). On
electric start engines mount the bracket with
control panel attached to the crankcase using the
two hex flange head screws. Torque the screws to
10-12 N·m (88-106 in. lb.).
3. Check that the ground leads are secured at the
bracket locations, as shown in Figures 11-83
through 11-85.
CS8.5-12: Reattach the ignition system ground
lead to the crankcase boss adjacent to the
governor shaft (See Figure 11-85), or to the
control module mounting bolt location based on
model involved.
11.22
Figure 11-85. CS8.5-12. Ground Lead Location.
Install Governor Lever, Throttle Link,
Throttle and Governor Springs
1. Install the governor lever onto the shaft. Do not
tighten at this time. Adjustment will be made
later.
Figure 11-86. CS4, CS6. Governor Lever Details.
2. Connect the governor spring to the arm of the
governor lever and into the slot in the throttle
lever. See Figures 11-89, 11-90, and 11-91
according to model number for proper assembly
if necessary.

Advertisement

Table of Contents
loading

Table of Contents