Kohler Command PRO CS Service Manual page 137

4-12.75 hp horizontal crankshaft
Table of Contents

Advertisement

Install the counter gear into the pre-oiled bearing
boss in the closure plate, engaging teeth with gear
on crankshaft.
Install the output shaft/gear assembly into the
corresponding pre-oiled bearing boss in the
closure plate. See Figure 11-33.
Figure 11-33. CS8.5-12. Installing Counter Gear and
Output Shaft/Gear Assembly.
5. Install the dowel pins into their respective
locations in the closure plate, and install a new
gasket (dry) onto the dowel pins. See Figures
11-34 and 11-35.
Figure 11-34. CS4, CS6. Installing Dowel Pins and
Gasket.
Figure 11-35. CS8.5-12. Installing Dowel Pins and
Gasket.
6. Assemble the cover onto the closure plate,
aligning the dowel pin and hole locations.
7. Install the cover mounting screws and torque to:
CS4,CS6: 10 N·m (88.5 in. lb.)
CS8.5-12: 30 N·m (265 in. lb.)
Figure 11-36. CS4, CS6. Torquing Cover Mounting
Screws.
Figure 11-37. CS8.5-12. Torquing Cover Mounting
Screws.
Section 11
Reassembly
11
11.9

Advertisement

Table of Contents
loading

Table of Contents