Gateway ALR 9250R User Manual page 33

Table of Contents

Advertisement

Securing the system
Because of the nature of the rack system, primary physical security is
provided by the cabinet itself. The security procedures specified below are
in addition to any site security required.
1.
Close the rear door of the system cabinet and lock it if desired.
Push the system drawer back until its front panel presses against the
2.
vertical mounting rails in the cabinet. Secure the drawer with four
screws.
Close the front door and lock it if desired.
3.
To secure the system
Chapter 1: Getting Started
19

Advertisement

Table of Contents
loading

Table of Contents