Test Run Checkpoints - YASKAWA VS?616G5 Owner's Manual

Yaskawa vs?616g5 inverter owner's manual
Hide thumbs Also See for VS?616G5:
Table of Contents

Advertisement

4
OPERATION
4.2

TEST RUN CHECKPOINTS

To assure safety, prior to initial operation, disconnect the machine coupling so that the motor is
isolated from the machine. If initial operation must be performed while the motor is still coupled
to the machine, use great care to avoid potentially hazardous conditions. Check the following items
before a test run.
V Wiring and terminal connections are correct.
V No short circuit caused by wire clippings.
V Screw−type terminals are securely tightened.
V Motor is securely mounted.
V All items are correctly earthed (grounded).