Regulations And Guidelines; General; Boilers Covered By This Document; Uncrating - DeDietrich GT 430 A Operating Instructions Manual

Hide thumbs Also See for GT 430 A:
Table of Contents

Advertisement

The installation and operating instructions shown here are given as a
guide for installation and operation and are not meant to replace any
State or Local Codes that may apply to the individual installation.
Good engineering practice should be used. Any deviation from laws
or regulations or industry Code or these instructions will void the
boiler warranty and any other responsibility or liability of the De
Dietrich Thermiques S.A.
• THE BOILER SHALL BE ASSEMBLED AND INSTALLE D BY A
QUALIFIED PROFESSIONAL ONLY. STRICT COMPLIANCE WITH
THESE INSTALLATION AND OPER ATING INSTRUCTIO NS IS A
PRECONDITION FOR THE CORRECT AND GUARANTEE OF THE
BOILER.
• THE INSTALLATION MUST CONFORM TO THE
REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION
OR, IN THE ABSENCE OF SUCH REQUIREMENTS, TO THE CAN/
CGA B-149 FUEL GAS INSTALLATION CODES AND CSA B-139
OIL INSTALLATION CODES.
• WHERE REQUIRED BY THE AUTHORITY HAVING
JURISDICTION, THE INSTALLATION MUST CONFORM TO THE
STANDARD FOR CONTROLS AND SAFETY DEVICES FOR
AUTOMATICALLY FIRED BOILERS ANSI/ASME CSD-1.
The boilers of the GT430 A range are automatic independent hot-
water boilers designed for con necting to a flue which require a
separate fuel oil or gas burner.

1 Boilers covered by this document

The GT 430 A boilers are pressurized hot water heating boilers,
connected to a flue, fitted with an independent burner using domestic
fuel oil or gas.

2 Uncrating

Upon arrival, check shipment to ensure all parts have been shipped.
Inspect all items for
delivery damage. Report all damage and
shortages to the delivery carrier. Report any damage and shortages
to the Distributor.
4
82294154

Regulations and guidelines

Only a qualified and licensed heating professional is to carry out the
removal, installation, startup and maintenance of this boiler. The boiler must
be installed according to all national and local codes having jurisdiction. The
operation of the boiler must be verified and all safety controls checked. Any
defect or abnormal operations must be corrected immediately. The entire
system requires annual service and cleaning at least once a year.

Installation codes

• THE INSTALLATIO OF THE RELIEF VALVE SHALL BE
CONSISTENT WITH ANSI/ASME BOILER PRESSURE VESSEL
CODE, SECTION IV CSA B51.
• THE BOILER MUST NOT BE INSTALLED ON CARPETING.
• IF AN EXTERNAL ELECTRICAL SOURCE IS UTILIZED, THE
BOILER WHEN INSTALLED, MUST BE ELECTRICALLY BONDED
TO GROUND IN ACCORDANCE WITH THE REQUIREMENTS OF
THE AUTHORITY HAVING JURISDICTION OR, IN THE
ABSENCE O F SUCH REQUIREMENTS , WI TH THE CANADIAN
ELECTRICAL CODE PART 1, CSA C22.1, ELECTRICAL CODE.
LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN
SERVICING CONTROLS. WIRING CAN CAUSE IMPROPER
OPERATION AFTER SERVICINGS. "VERIFY PROPER
OPERATION AFTER SERVICE".

General

The boiler is equipped with standard control panel.
11-20-09

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt 330 a

Table of Contents