Shut-Down Procedures - DeDietrich GT 430 A Operating Instructions Manual

Hide thumbs Also See for GT 430 A:
Table of Contents

Advertisement

1 Shut-down procedures

Disengage all electrical power switches to heating system burners,
pumps. Isolate all boiler valves and fuel valves.
4
1.BOILER OPERATING TEM PERATURE CONTROL graduated
from (# 4-10) 104f-210f. factory preset a t (# 7) 158f. to adjust, remove
knob by pulling outwards. Using a pair of pliers pull white pin and
relocate to desired setting.
2.LIMIT CONTROL same graduations as the NO.1 control apply.
3.BOILER TEMPERATURE INDICATOR
4.HIGH LIMIT MANUAL RESET: to reset remove knob, using a thin
screwdriver insert into opening and push it. Replace knob.
OPERATING PRINCIPLE OF CONT ROLS adjust boile r operating
temperature settings using control marked operator NO.1.
Control dial temperature settings
Dial #
4
5
Temp F
104
122
Important : (in the absence of bas) Do not set controls below the
number 5 (122f) setting.
40
82294154
3
6
7
8
140
158
176
For off-season shutdown, open boiler comb ustion flue aways and
clean. Ensure venting, chimney , combustion and ventilation air
openings free from blockage. Do not drain waterside of system.
30
°C
2
Control marked NO.2 is the high limit with it set point adjusted above
operator setting.
(see electrical diagram inside boiler panel)
START UP following the operating principle of the contro ls and
confirming completed circuit of other external limits. Apply power for
system start up.
DDR AMERICAS INC.
DE DIETRICH THERMIQUE
9
10
194
210
1
11-20-09
8553N185

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt 330 a

Table of Contents