Jianshe JS125-6B Maintenance Manual page 173

Table of Contents

Advertisement

CABLE AND ELECTRIC APPLIANCE SYSTEM
Socket connector inspection
Clean away the dirt, rust and moisture on the socket
connectors
1. Disconnect:
Socket connectors
2. Dry every binding post with bowing device
3. Connect and disconnect every socket connector
2 3 times
4. Stretch the wires to check if the wire is disconnected.
5. If the binding post is drawn out, the pin should be
crankled. Insert the binding post into the socket
connectors.
6. Connection
Socket connectors
7. Check if the socket connectors are powered on
with a multitester.
Note
If the circuit is found not powered, then clean the
binding poles.
Repeat the inspection noted in the above 1
7porcedures after check the wires.
Do inspect the socket connectors after replacing
the CDI device.
Check the socket connectors with a multitester as
shown in the figure.
163

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Jianshe JS125-6B

Table of Contents