3.4
Installation of Operator Unit
3.4.1
Assembly
The Operator Unit must be installed with the aid of dimensional drawing
130--613 HP005 either on an angled fixing bracket or desk-flush mounted.
Make sure that the installation is resistant to sea-water.
3.4.2
Overview of switches, jumpers and plugs
6
5
Figure 43: Operator Unit, rear view (with casing removed)
1
2
3
4
5
6
7
8
9
10
11
Edition: Nov. 16, 2007
Satellite Compass
7
8
4
Hexadecimal switch B24 (0 to F) for setting the device address
Hexadecimal switch B23 (0 to F) for setting the device address
Plug B1, either CAN 1 or RS422 Transmit (depending on jumper)
Plug B2, either CAN 2 or RS422 Receive (depending on jumper)
Jumper B14, CAN 2 -- RS 422 (Receive)
Jumper B15, CAN 2 -- RS 422 (Receive)
Jumper B13 (plugged -- CAN1 Bus terminating resistor on end device only)
Jumper B12, CAN 1 -- RS 422 (Transmit)
Jumper B16 (plugged -- CAN2 Bus terminating resistor on end device only)
Jumper B11, CAN 1 -- RS 422 (Transmit)
Plug B7, voltage supply (9--36 V d.c.)
STD 21 GPS
9
10
3
51
STD 21 GPS
2
1
3717/110--850.DOC020002
11