Installation Of Operator Unit; Assembly; Overview Of Switches, Jumpers And Plugs - Raytheon STD 21 GPS Operation Manual

Satellite compass
Table of Contents

Advertisement

3.4

Installation of Operator Unit

3.4.1

Assembly

The Operator Unit must be installed with the aid of dimensional drawing
130--613 HP005 either on an angled fixing bracket or desk-flush mounted.
Make sure that the installation is resistant to sea-water.
3.4.2

Overview of switches, jumpers and plugs

6
5
Figure 43: Operator Unit, rear view (with casing removed)
1
2
3
4
5
6
7
8
9
10
11
Edition: Nov. 16, 2007
Satellite Compass
7
8
4
Hexadecimal switch B24 (0 to F) for setting the device address
Hexadecimal switch B23 (0 to F) for setting the device address
Plug B1, either CAN 1 or RS422 Transmit (depending on jumper)
Plug B2, either CAN 2 or RS422 Receive (depending on jumper)
Jumper B14, CAN 2 -- RS 422 (Receive)
Jumper B15, CAN 2 -- RS 422 (Receive)
Jumper B13 (plugged -- CAN1 Bus terminating resistor on end device only)
Jumper B12, CAN 1 -- RS 422 (Transmit)
Jumper B16 (plugged -- CAN2 Bus terminating resistor on end device only)
Jumper B11, CAN 1 -- RS 422 (Transmit)
Plug B7, voltage supply (9--36 V d.c.)
STD 21 GPS
9
10
3
51
STD 21 GPS
2
1
3717/110--850.DOC020002
11

Advertisement

Table of Contents
loading

Table of Contents