Volvo VNL Service Manual page 87

Electrical general, group 30
Hide thumbs Also See for VNL:
Table of Contents

Advertisement

Group 30 Electrical System—VNL, VNM
Installation
1
1) Clock 2) Switch
Install the new clock assembly (1) into
the control panel and connect the
electrical connector
2
Remove the switch(es) in the right-
most positions in the rows of switches
from the panel before the panel is in-
stalled back into the bunk. This allows
better clearance when installing the
panel. To remove the switch, unplug
the switch connector and release the
top and bottom locking tabs using a
small flat tip screwdriver. The switch
will then push out of the front of the
panel.
3
Install the control panel into the bunk
by inserting the 3 tabs on the left side
W3000999
back into the air vent trim panel and
installing the 2 torx bolts. Torque to
1.5 ± 0.5 Nm (13 ± 5 in-lb).
4
Install the bunk light switch back into
the panel by connecting the switch
electrical connector and pushing the
switch into the panel until it locks in
place.
5
Gently pull on the switch to make cer-
tain it is locked in the panel.
Service Procedures
W3001000
1.5 ± 0.5 Nm
(13 ± 5 in-lb)
85

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vnm

Table of Contents