SmartNode 4400 Series Getting Started Guide
Introduction
This chapter contains information for planning the installation of the SmartNode 4400 IpChannel Bank with
the following installation procedures:
•
Section
"Unpacking the Model SN4400 series IpChannel Bank"
ping box
•
Section
"IpChannel Bank chassis installation"
surface or in a 19-inch rack
•
Section
"Connecting cables"
•
Section
"Connecting power"
figuration
Planning the installation
Before beginning the actual installation, we strongly recommend that you gather all the information you will
need to install and set up the device. See
for a smoother installation. Completing the pre-installation checks enables you to install and set up your
IpChannel Bank within an existing network infrastructure with confidence.
Before installing the IpChannel Bank device, the following tasks should be completed:
•
Prepare an installation checklist using the list provided in section
•
Initiate and mantain a site log using the information in section
•
Create a network diagram (see section
•
Gather IP related information (see section
•
Install the hardware and software needed to configure the SmartNode. (See section
on page 27)
•
Verify power source reliability (see section
When you finish preparing for your VoIP installation, go to section
page 28 to install the device.
Introduction
on page 28 describes installing the IpChannel Bank on a flat
on page 29 describes installing the power and port cables
on page 31 describes how to verify that the IpChannel Bank is ready for con-
table 4
for an example of installment checklist that may be necessary
"Network information"
"IP related information"
"Power source"
3 • Hardware installation
on page 28 lists the contents of the ship-
"Installation checklist"
"Site log"
on page 26 as a guide
on page 27)
on page 27 for more information)
on page 27).
"Installing the IpChannel Bank"
on page 26
"Configuration tools"
on
25
Need help?
Do you have a question about the SmartNode 4400 and is the answer not in the manual?
Questions and answers