Introduction - Patton electronics SmartNode 4400 Getting Started Manual

Ipchannel bank
Hide thumbs Also See for SmartNode 4400:
Table of Contents

Advertisement

SmartNode 4400 Series Getting Started Guide

Introduction

This appendix lists the tasks for installing a SmartNode 4400 IpChannel Bank (see
this checklist and mark the entries as you complete each task. For each IpChannel Bank, include a copy of the
completed checklist in your site log.
Network information available & recorded in site log
Environmental specifications verified
Installation site pre-power check completed
Additional equipment available
All printed documents available
SmartWare release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Initial configuration performed
Introduction
Table 12. Installation checklist
Task
Site power voltages verified
Required tools available
Cable length limits verified
Initial operation verified
F • Installation checklist
table
12). Make a copy of
Verified by
Date
69

Advertisement

Table of Contents
loading

Table of Contents