Installation; Inspecting The Equipment; Unpacking The Cabinet - Minuteman 6-10KVA Tower User Manual

Online ups
Table of Contents

Advertisement

3. Installation

This chapter explains:
Equipment inspection

Unpacking the cabinet

Checking the Accessory
UPS setup and installation
Connecting the internal battery
Connecting the EBM(s)
Installation requirements

3.1 Inspecting the Equipment

If any equipment has been damaged during shipment, keep the
shipping cartons and packing materials for the carrier or place of
purchase and file a claim for shipping damage. If you discover
damage after acceptance, file a claim for concealed damage.
Note: Check the battery recharge date on the shipping carton label.
If the date has passed and the batteries were never recharged, do
not use the UPS. Contact your service representative.
3.2 Unpacking the Cabinet
CAUTION: Unpacking the cabinet in a low-temperature environment
may cause condensation to occur in and on the cabinet. Do not
install the cabinet until the inside and outside of the cabinet are
absolutely dry (hazard of electric shock).
CAUTION: The cabinet is heavy. Use caution to unpack and move
the cabinet.
Be careful when moving and opening the carton. Leave the
components packaged until ready to install. To unpack the system:
9

Advertisement

Table of Contents
loading

Table of Contents