General Fcc Requirements - PACH & COMPANY AeGIS 8000 Series Installation And Programming Manual

Telephone access control systems
Hide thumbs Also See for AeGIS 8000 Series:
Table of Contents

Advertisement

GENERAL FCC REQUIREMENTS

This equipment complies with Part 68 of the FCC rules. Located on the back of your AeGIS system is a label
that contains, among other information, the FCC registration and ringer equivalence number (REN) for the sys-
tem. Prior to installing your AeGIS system, please call your telephone company and provide them the FCC regis-
tration and REN numbers as well as the telephone number of the line to which you will connect the system.
Your AeGIS system connects to the telephone line by means of a standard jack called the USOC RJ11C. If this
type of jack is not available at the location you want to install your AeGIS system, you will need to call your
telephone company and order one.
Your AeGIS system connects to the Public Switching Telephone Network via standard-device telephone lines. IT
SHOULD NOT BE CONNECTED TO "PARTY" OR "COIN SERVICE" LINES.
Should you have any questions about the telephone line you intend to connect your AeGIS system to, or other
questions such as how many other devices you can connect to your telephone line, your telephone company will
provide you upon request.
In the unlikely event your AeGIS system develops a problem, IMMEDIATELY DISCONNECT IT FROM YOUR
TELEPHONE LINE to avoid harmful causes to the telephone network.
If repairs are ever needed on your AeGIS system, ONLY Pach and Company technician should
perform them. Please contact our Toll Free Technical Service Department at 888-678-7224 for immediate
assistance.
Should your telephone company determine that your AeGIS system developed a problem, they may notify you in
advance that temporary discontinuance of service may be required. In some cases advance notice isn't
practical, so your telephone company will notify you as soon as possible. You will also be advised by your
telephone company of your right to file complaint with the FCC if you believe it necessary.
From time to time the Telephone Company may make changes to it's facilities equipment, operations, or
procedures that could affect the operation of your AeGIS system. If this happens, the Telephone Company will
provide advanced notice in order for you to make the necessary modifications to your AeGIS system to maintain
uninterrupted service.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents