PRE-DELIVERY
1.1
Drive coupling alignments, pan and star meshing of pan rack and drive gear.
1.2
Operating clearances star blade to pan. Fixed blade to pan wall.
1.3
Correct oil level in gearboxes. All grease points charged. Gear teeth greased.
1.4
No load test. Correct rotations.
PRE INSTALLATION
2.1
Check consignment.
2.2
Offload equipment using certified lifting gear of suitable capacity, by a competent
person (see separate chart for nett weight).
INSTALLATION
Refer to contract arrangement and site instructions.
3.1
3.2
Mixer to be mounted on supports of adequate strength and rigidity to prevent undue
vibration when mixing and securely bolted.
3.3
Mixer frame to be level on structure, add packers as required.
3.4
Check that pan is correctly seated and that pan rack and drive gear are in correct
mesh.

ELECTRICAL SERVICES

Refer to wiring diagram in Ops Manual. All wiring to be undertaken by competant
4.1
electrician, it is recommended that the mains electrical supply is provided via an earth
leakage circuit breaker. NOTE: electrical cables particularly those with copper
conductors suffer from a condition known as 'relaxation' which may cause wiring to
work loose over a period of time, it is recommended that the tightness of wiring
connections and terminals are checked following the first month in service.
RP100XD MK2
OPERATIONAL AND SAFETY
REQUIREMENTS