( Z.c Application ); Framing Dimensions - Valor 922ECN Installation And Owner's Manual

Open front decorative vented gas fireplace
Table of Contents

Advertisement

4.2 Enclosures Constructed Using Combustible Materials ( Z.C Installations)
Optional # 975 ZCK zero clearance kit must be used when installing the
922 Fireplace into any application other than as an insert into an approved
solid fuel burning fireplace cavity and chimney. Complete installation
instructions are packed with the 975 ZCK. See fig 2 for clearances in front
of appliance. The 975 ZCK is approved for installation directly on
combustible type flooring such as plywood. Bottom of 975 must be installed
at top of finished hearth (including tile etc.) or the removable ashpan cover
will not rest at the proper height. Cast iron fronts must also rest on a secure
hearth or floor as the unit is not intended to carry the weight of the castings.
The 975 ZCK may be roughed-in, wall finishes applied , and the fireplace
installed at a later date or the fireplace and Z.C kit may be installed at the
same time.
975 ZCK Assembled
975 ZCK Components
975 ZCK installed into Framing

Framing Dimensions

975 ZCK Wall Finish Details