Vermiculite; Function Testing - Nordpeis N-24 round Installation & User Manual

Hide thumbs Also See for N-24 round:
Table of Contents

Advertisement

Vermiculite

The vermiculite consists of 9 different parts that are ready fixed in the inset upon delivery. If you need
to replace vermiculite, please contact your dealer.
Disassembling of the vermiculite plates is done in reverse order according to figure 11a or 11b.
Assembling order for inset N-21 (figure 11a)
1.
Upper baffle plate (flange turned upwards)*
2.
Front moulding
3.
Bottom plate
4.
Right side plate
5.
Left side plate
6.
Left corner plate
7.
Right corner plate
8.
Back plate with logo
9.
Lower baffle plate with metal air duct **
Figure 11a
4
6
* When replacing the upper baffle plate, part one; the steel profile must be transferred to the new
vermiculite plate before mounting.
** When replacing the lower baffle plate the metal air duct must be transferred to the new vermiculite
plate.

Function testing

When the inset is assembled an put in place but before pasting up the concrete surroundings one
should test these functions:
Lighting draught control
(lower right side)
Inner position = closed
Outer position = open
12
1
9
8
7
5
3
2
Firing draught control
(Top centre)
Left position = closed
Right position = open
Assembling order for inset N-24 (figure 11b)
1.
Upper baffle plate (flange turned upwards)*
2.
Front moulding
3.
Bottom plate
4.
Right side plate
5.
Left side plate
6.
Left corner plate
7.
Right corner plate
8.
Back plate with logo
9.
Lower baffle plate with metal air duct **
Figure 11b
4
6
Door
Handle turned down = closed
N21: Handle turned out = open
N24: Handle turned left = open
1
9
8
7
5
3
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

N-21

Table of Contents