System Earthing; Terminating The Lan; Figure 19: Lan Connection Using Twisted Pair Cable - Bosch Solution 144 Quick Start Manual

Hide thumbs Also See for Solution 144:
Table of Contents

Advertisement

2.5mm
Connect to
main building
C. E. T.
*
earth conductor.
Shield only
connected
at one end.
+ -
A B
Belden 8723
2 pair twisted
shielded data
cable is
recommended
for this wiring
configuration.
+
-
A
The LOOP
terminal is
not internally
connected.
It can be
used to
terminate
+
the LAN+
-
on modules
A
which have
an on board
power supply.
Positive LAN
voltage is
re-generated
by the CM720
Power Supply.
-
A B
Shield not
connected
at this end.
= SHIELD
= EARTH

Figure 19: LAN Connection Using Twisted Pair Cable

The LAN- terminals from all modules must be connected
together for correct operation.
Bosch Security Systems 10/12 BLCC600R
2
Yellow/Green
CONTROL PANEL
EARTH
+
L
-
TERM
A
Y
A
N
Fit Shunt
B
First Device
E
CM704-ZONE EXPANDER
EARTH
+
L
-
TERM
A
Y
A
N
B
B
E
KEYPAD
NOTE:
Do NOT connect
+
plug pack
L
Earth wires to
-
any modules
A
A
when running
N
a separate
B
communication
earth wire.
E
CM720-POWER SUPPLY
B
EARTH
LOOP
-
TERM
L
Y
A
A
N
B
OUT
+12V
E
CM710-OUTPUT EXPANDER
EARTH
+
L
-
TERM
A
Y
A
N
Fit Shunt
B
Last Device
= LAN -
= LAN +
= LAN B
= LAN A
= RE-GENERATED LAN +
System Ear th ing
When running a CET communications Earth as per
Figure 19, the communication earth should be connected
to the earth terminal on each module and then connected
back through the CET to the main building earth conductor.
LAN
N
Do NOT connect the plug pack transformers earth wire to
any modules earth terminal.
If a separate Communications Earth wire is
i
installed, do NOT connect the EARTH wire from
any 3 wire plug pack to any modules EARTH input
Note
terminal.
LAN
If a separate communications earth is NOT being used,
N
then you should connect the earth wire from the 3 wire
plug pack to the panels earth terminal as shown in Figure
19.
When using shielded cable, the shield of each length of
cable should only be connected to a protective earth at one
end. Do no allow the shield to make contact with negative
0 volts, ground or any other wiring within the system.
All earth wiring should be carried out in accordance with
the local wiring regulations in your area.
Ter mi natin g the L AN
For reliable operation, the system LAN must be terminated
LAN
correctly. The control panel and all LAN modules include a
N
LAN TERM pin header and shunt which is used to connect
the termination resistor on the module.
When the shunt is installed between the Y pin and the
centre pin, the terminator is fitted and when the shunt is
between the N pin and the centre pin the terminator is not
fitted.
LAN
Where all modules are connected to the panel on a single
N
cable run, (Daisy Chained) the terminators should be
installed on the first and last modules on the LAN.
If the modules are connected to the panel via multiple
cables
all running back to the control panel (Star
Configuration) then the terminators should be installed on
the modules at the end of the two longest cable runs.
There are no LAN terminators on keypads. If a keypad is
one of the two furthest devices from the control panel
then a 470 ohm 1/2watt resistor can be fitted at the keypad
between the LAN A and LAN B terminals.
The LAN must be terminated correctly for correct
i
operation.
Note
Solution 144 Quick Start Guide
11

Advertisement

Table of Contents
loading

Table of Contents