Top Stand-Off Assembly - Travis Industries GreenSmart 564 SS Installation Manual

Hide thumbs Also See for GreenSmart 564 SS:
Table of Contents

Advertisement

Top Stand-Off Assembly

The top stand-offs must be assembled prior to installation.
Warning:
You must follow the instructions below to elevate both standoffs. Failure to
do so will result in an extreme fire hazard.
AFTER
© Travis Industries
Installation
(for qualified installers only)
BEFORE
The standoffs are shipped in the flat position.
Make sure to follow the instructions below before
installing the fireplace.
Standoff
Bend the standoff in the numbered
a
sequence shown above.
Remove the screw below the standoff.
b
Replace the screw to secure the standoff.
c
4081126
2
3
1
100-01210_000
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents