Travis Industries GreenSmart 564 SS Installation Manual page 56

Hide thumbs Also See for GreenSmart 564 SS:
Table of Contents

Advertisement

56
Finalizing the Installation
3
Follow the directions below to replace the orifice.
Slide the air shutters all
a
the way to the right.
Remove and discard the front burner
b
gasket (used only for NG installations)
Front Burner
Orifice
Use a 1/2" open end wrench
c
to unscrew the two orifices.
e
Screw each LP orifice in so the
orifice protrudes 15/16"
(indicating full insertion).
Travis Industries
(for qualified installers only)
1/2" Wrench
Rear
Burner
Orifice
15/16"
4081126
d
Apply thread sealant to the LP
orifices prior to installation. Use
the chart below to identify the
correct orifices.
Look here for the orifice identification
NG
Front
#56
Rear
#50
LP
#67
1.1
100-01210_000

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents