Packing List
•
Propane Conversion Kit
•
Log Set
•
Firestop (sku 250-00747)
Additional Items Required
•
Direct Vent
•
Gas Line Equipment (shutoff valve, pipe, etc.)
•
Electrical Equipment (min. 14 gauge, grounded line)
Installation Overview
•
All requirements below must be met.
Top Vent
Configuration
See the section
"Mantel Requirements"
Drywall
Drywall
Side
1" Min.
Wall
See "Optional Non-
See "Optional Non-
Combustible Facing"
Combustible Hearth"
Recommended Installation Procedure
•
Frame the opening for the fireplace. Make sure to allow for vent installation.
•
This fireplace is designed to accommodate 1/2" or 5/8" drywall (see "Nailing Brackets" on page
15 for details). Secure the fireplace to the framing.
•
Install the vent, gas line and electrical hook-up.
•
Install the drywall.
•
Install the hearth (if applicable).
•
Install the facing (if applicable).
•
Install the mantel (if applicable).
•
Finalize the installation (see page 44) and install the grill or face.
© Travis Industries
Installation
(for qualified installers only)
See the section
"Electrical Connection"
See the section
"Vent Requirements"
See the section
"Approved Vent
Configurations"
Insulation must not fill
the 1/2" clearance
around the back and
sides of the fireplace.
Nailing Brackets
See the section "Minimum
Framing Dimensions"
See the section
"Gas Line Installation"
4081126
Rear Vent
Configuration
Required Travis
Firestop (sku
250-00747)
100-01210_000
7