GREAT PLANES Pitts M-12S Instruction Manual page 23

Table of Contents

Advertisement

3. Mount the engine with the hardware that came with
the engine.
4. Install a ball link on both the choke arm and the
carburetor arm. We have included both .080 and a 2-56
threaded balls, washer and nuts. Choose whichever one
best fi ts the hole in the arms. Be sure that you use thread
locker on the threads.
5. Locate two plywood throttle pushrod supports. Glue
the longest support to the former shown in the photograph,
aligning it with the edge of the fuel tank tray.
6. Glue the remaining support inside of the fuselage
as shown.
23

Advertisement

Table of Contents
loading

Table of Contents