Filling The Lp Cylinder; Installing The Lp Cylinder - Pioneer Eclipse revolution REV24NXG Operator's Manual

Uhs propane bursnisher
Table of Contents

Advertisement

Filling the LP Cylinder

The Revolution uses the 20lb (9.1 kg) capacity cylinder,
which meets the D.O.T. 4E240 standards. These cylinders
are also listed by UL. In addition, the steel cylinder meets
European TPED specifications and is CE compliant.
Filling should be done ONLY by a qualified propane dealer.
A properly filled cylinder should not exceed 80% of the
rated capacity. Do not overfill the cylinder or use a liquid
withdraw cylinder on the machine. The use of a liquid
withdraw cylinder on a vapor withdraw system could freeze
the regulator and create a fire hazard.

Installing the LP Cylinder

®
Place the Safe-Fill
cylinder on the cylinder platform at the
back of the machine. Connect the fuel hose coupling to
the service valve by turning to the right (clockwise). HAND
TIGHTEN ONLY! Make sure coupling is not cross
threaded and check for leakage by noting any propane
odors immediately after cylinder is connected. Finally,
connect the two ends of the tank strap together.
To Remove the LP Cylinder
procedure. Always connect or change cylinders in a
well-ventilated area.
, reverse the above
8

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the revolution REV24NXG and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Revolution rev28nxg

Table of Contents