Installation And Checkout; Crating; Uncrating - Control Data Corporation INFORMATION SYSTEMS TERMINAL II Hardware Maintenance Manual

Table of Contents

Advertisement

INSTALLATION AND CHECKOUT
3
This section describes the crating, uncrating, installa-
I
tion, checkout procedures, memory expansion installation,
and optional modem installation for the terminal as well as
instructions for connecting the terminal to the PLATO
system.
CRATING
Figure 3-1 details the crating procedures to be followed
when preparing the terminal for shipment.
Use only
approved materials to protect against shipping damage.
Ship only by van or air.
Do not ship via truck or ocean
vessel.
Approximate shipping weight of the packaged ter-
minal is 45 lb (21 kg) for the domestic unit, and 53 lb
(24 kg) for the international unit.
To protect against shipping damage, always prepare the
terminal for shipment using only approved procedures and
materials.
To obtain proper procedures and materials,
contact the nearest CDC representative or:
UNCRATING
Control Data Corporation
Corporate Traffic
8100 34th Avenue South
Minneapolis, Minnesota
55440
The following instructions describe the uncrating proce-
dures for the terminal.
Refer to figure 3-1 to remove the
terminal from the exterior container.
1) Open top of exterior ,container.
2) Lift terminal with end frames attached from exterior
container.
Remove end frames.
3) Inspect terminal for shipping damage.
82100083 D
3-1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the INFORMATION SYSTEMS TERMINAL II and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents