Camera Video And Power Cable Installation - Iteris RZ4 Advanced Installation Manual

Table of Contents

Advertisement

7. Programming 
a. Labels: Camera, Configuration, Zones 
b. Check using MOD (Mode) menu item 
Channel Assignment and Zone Type 
c. Set MOD (Mode) 'Inact/Ch to "NoCall" 
d. Set Options if needed 
e. Set Clock (Clk) Time and Date information 
f.
Make sure the test switches are all in the middle position (normal) 
8. Archive snapshots and configurations. using VRAS 
9. Observe operation during critical times 
Morning transition 
Noon time 
Evening transition 
Night time 
10. Document count zones (if used) 
11. Turn OFF menu / Turn Off Monitor 
 
This is by no means intended to be a detailed and all inclusive list. 

4.2 Camera Video and Power Cable Installation

This procedure describes how to install the coaxial and power cables between the camera mounting 
location and the traffic control cabinet. If you are installing multiple cameras, perform the procedure for 
each camera. 
The procedure is divided into the following parts: 
1. Running the cables 
2. Preparing the coaxial cable connectors 
3. Preparing the power cable connectors 
4. Preparing the coaxial cable at the cabinet 
 
Running the Cables
1. Run one continuous pull (without splices) of coaxial cable and power cable between the camera 
mounting location and the traffic control cabinet. The cables need to meet the following specifications: 
Belden 8281 coaxial cable 
Three‐conductor, 16 AWG power cable 
 
See the "Technical Information" section for the specific cable specifications. 
 
 
 
 
 

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RZ4 Advanced and is the answer not in the manual?

Subscribe to Our Youtube Channel

Related Products for Iteris RZ4 Advanced

Table of Contents