Mounting - Edge-Core ECS4610-24F Installation Manual

24-port layer 3 gigabit ethernet switch
Hide thumbs Also See for ECS4610-24F:
Table of Contents

Advertisement

| Installing the Switch
C
3
HAPTER

Mounting

M
OUNTING
This switch can be mounted in a standard 19-inch equipment rack or on a
desktop or shelf. Mounting instructions for each type of site follow.
R
M
ACK
OUNTING
Before rack mounting the switch, pay particular attention to the following
factors:
Temperature: Since the temperature within a rack assembly may be higher
than the ambient room temperature, check that the rack-environment
temperature is within the specified operating temperature range.
Mechanical Loading: Do not place any equipment on top of a rack-mounted
unit.
Circuit Overloading: Be sure that the supply circuit to the rack assembly is
not overloaded.
Grounding: Rack-mounted equipment should be properly grounded.
Particular attention should be given to supply connections other than direct
connections to the mains.
To rack-mount devices:
Attach the brackets to the device using the screws provided in the Bracket
1.
Mounting Kit.
– 40 –

Advertisement

Table of Contents
loading

Table of Contents