Equipment Checklist - Edge-Core ECS4610-24F Installation Manual

24-port layer 3 gigabit ethernet switch
Hide thumbs Also See for ECS4610-24F:
Table of Contents

Advertisement

E
QUIPMENT
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
P
C
ACKAGE
ONTENTS
Gigabit Ethernet Switch (ECS4610-24F)
Power Cord—either US, Continental Europe or UK
Two rack-mounting brackets and eight screws
RJ-45 to DB-9 serial converter (for console connection)
This Installation Guide
Management Guide CD
O
R
PTIONAL
ACK
If you plan to rack-mount the switch, be sure to have the following equipment
available:
Four mounting screws for each device you plan to install in a rack—these
are not included
A screwdriver (Phillips or flathead, depending on the type of screws used)
C
HECKLIST
-M
E
OUNTING
C
HAPTER
QUIPMENT
– 39 –
| Installing the Switch
3

Equipment Checklist

Advertisement

Table of Contents
loading

Table of Contents