Equipment Checklist; Package Contents; Optional Rack-Mounting Equipment; Figure 3-1 Rj-45 Connections - Edge-Core ES3510 Installation Manual

10-port fast ethernet switch
Hide thumbs Also See for ES3510:
Table of Contents

Advertisement

3
Installing the Switch

Equipment Checklist

After unpacking this switch, check the contents to be sure you have received all the
components. Then, before beginning the installation, be sure you have all other
necessary installation equipment.

Package Contents

• Fast Ethernet Switch (ES3510)
• Four adhesive foot pads
• Bracket Mounting Kit containing two brackets and eight screws for attaching the
brackets to the switch
• Power Cord—either US, Continental Europe or UK
• RS-232 console cable
• This Installation Guide
• Management Guide CD

Optional Rack-Mounting Equipment

If you plan to rack-mount the switch, be sure to have the following equipment
available:
• Four mounting screws for each device you plan to install in a rack—these are not
included
• A screwdriver (Phillips or flathead, depending on the type of screws used)
3-2
RJ-45 Connector

Figure 3-1 RJ-45 Connections

Advertisement

Table of Contents
loading

Table of Contents