Equipment Checklist; Package Contents; Optional Rack-Mounting Equipment; Figure 3-1 Rj-45 Connections - Edge-Core ES3528M-PoE Installation Manual

Fast ethernet switch
Table of Contents

Advertisement

3
Installing the Switch

Equipment Checklist

After unpacking the switch, check the contents to be sure you have received all the
components. Then, before beginning the installation, be sure you have all other
necessary installation equipment.

Package Contents

• ES3528M-PoE switch
• Four adhesive foot pads
• Bracket Mounting Kit containing two brackets and eight screws for attaching the
brackets to the switch
• Power cord—either US, Continental Europe or UK
• RS-232 console cable
• This Installation Guide
• Management Guide CD
• Warranty Card

Optional Rack-Mounting Equipment

If you plan to rack-mount the switch, be sure to have the following equipment
available:
• Four mounting screws for each device you plan to install in a rack—these are not
included
• A screwdriver (Phillips or flathead, depending on the type of screws used)
3-2
RJ-45 Connector

Figure 3-1 RJ-45 Connections

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Es3528mf-poe

Table of Contents