Equipment Checklist - Edge-Core ECS3610-28T Installation Manual

Table of Contents

Advertisement

E
QUIPMENT
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
P
C
ACKAGE
ONTENTS
28-port Fast Ethernet Switch (ECS3610-28T)
Four adhesive foot pads
Bracket Mounting Kit containing two brackets, various screws for attaching
the brackets to the switch, and plastic wall anchors for attaching the unit to
a wall
Power cord—either US, Continental Europe or UK
Console cable (RS-232)
This Installation Guide
Management Guide CD
O
R
PTIONAL
ACK
If you plan to rack-mount the switch, be sure to have the following equipment
available:
Four mounting screws for each device you plan to install in a rack—these
are not included
A screwdriver (Phillips or flathead, depending on the type of screws used)
C
HECKLIST
-M
E
OUNTING
C
HAPTER
QUIPMENT
– 39 –
| Installing the Switch
3

Equipment Checklist

Advertisement

Table of Contents
loading

Table of Contents